Products
- Brake System[1]
- Diesel Generators[5]
- Gas Turbine Generators[3]
- Gasoline Generators[3]
- Hooks[1]
- Lamp Poles[1]
- Air-Compressors[10]
- Cement Making Machinery[6]
- Sand Making Machinery[1]
- Bulldozers[10]
- Compactors[3]
- Concrete Batching Plant[3]
- Concrete Mixers[7]
- Concrete Pumps[7]
- Excavators[10]
- Loaders[10]
- Motor Graders[10]
- Other Construction Machinery[10]
- Pavers[10]
- Road Roller[10]
- Engines[2]
- Tractors[10]
- Conveyors[7]
- Cranes[10]
- Forklifts[1]
- Other Material Handling Equipment[2]
- Crusher[10]
- Drilling Rig[10]
- Mine Mill[3]
- Other Mining Machinery[1]
- Vibrating Screen[1]
- Mining Machinery Parts[1]
- Firefighting Equipment[9]
- City Bus[1]
- Coach[10]
- Fire Truck[1]
- Tow Truck & Wrecker[1]
- Truck Trailer[1]
- Tanker Truck[1]
Contact Us
- Contact Person : Ms. zhao galia
- Company Name : Beijing Mayastar Machinery & Electrical Equipment Co., Ltd.
- Tel : 0086-10-59560491
- Fax : 0086-10-59560447
- Address : Beijing,Beijing,Room 1403 Unit 2 NO. 9 Building Zhongxinjiayuan of Maliandao Street Xuanwu District Beijing China
- Country/Region : China
- Zip : 10055
Product Detailed
Related Categories:Concrete Pumps
Related Product Searches:Climbing Elevator Shaft Concrete Placing Booms,High Quality,concrete boom pump, concrete pump with boom,Ship mounted HGC38
Ship mounted HGC38 Concrete Placing Booms:
1. Max. placing radius: 38.8m;
2. Rotary speed: 1450rpm
Related Product Searches:Climbing Elevator Shaft Concrete Placing Booms,High Quality,concrete boom pump, concrete pump with boom,Ship mounted HGC38
Ship mounted Concrete Placing Booms: HGC38
Main Features:
The structure of boom is optimized by adopting advanced design and technologies such as finite element analysis, dynamics emulate, model analysis, sample machine test, etc. Imported high strength steel ensures high quality and reliability;Key components such as boom and vertical column adopt overall heat treatment to control residual stress and deformation efficiently; Through assembly welding, the vertical column is of high interchangeability; With the proportional control technology applied in multi-valve, the change of boom's motion speed can be changed at random by adjusting the angle of driving handle, which is of superior operating performance; With remote control distance up to 100 meters and four optional frequency ranges, simple and reliable operation could be carried out;Diversified installation modes of the boom includes floor type, elevator shaft type, wall type, ship mounted type and tower type; The embedded parts can be recycled; Two inter-locked working status of placing and climbing enhances the safety and reliability of climbing process; Application of double-layer anti-friction transfer pipe, with a service life up to 30,000-50,000 cubic meters, which is 3-5 times of normal pipe;Hydraulic system adopts double-pump variable flow control technology; The second generation placing boom for elevator hoistway installation can be applied for floor installation and elevator hoistway installation; when it is applied for elevator hoistway installation, the retractable outrigger technology is suitable for elevator hoistway with dimension of 2.0- 2.7mand the climbing frame is fully auto-lifted by motor hoist.Specifications:
Model | HGC38 | |
Max. placing radius | 38.8m(126′24″) | |
Rotation of boom | 365° | |
Operating ambient temperature | (-10~+45)° | |
Tower height | 7.2m(23′8″)(shipyard shall prepare 4m pylon by itself) | |
Installation mode | Marine | |
Climbing speed | - | |
Climbing mode | - | |
Motor model | Y225S-4-H B35 IP44 | |
Power | 37 kw(49HP) | |
Rotary speed | 1450rpm(152.25rad/s) | |
System pressure | 30Mpa(4350 psi) | |
Flow | 47 L/min(13gal/min) | |
Oil tank capacity | 300L(79.3gal) | |
Control mode | close control /wire /remote control | |
Pipeline cleaning mode | Water cleaning/dry cleaning | |
Total mass | 13000kg(28660 lbs) | |
Boom type | 5 convolution full hydraulic | |
Diameter of delivery pipe | DN 125mm(5″) | |
End hose length | 3m(9′10″) | |
The 1st section | Length | 8090mm(26′6″) |
Articulation | 92° | |
The 2nd section | Length | 6820mm(22′4″) |
Articulation | 180° | |
The 3rd section | Length | 6825mm(22′5″) |
Articulation | 180° | |
The 4th section | Length | 8440mm(27′8″) |
Articulation | 270° | |
The 5th section | Length | 8715mm(28′7″) |
Articulation | 240° |
Climbing Elevator Shaft Concrete Placing Booms